• Drilling Stem Tools From China Manufacturer
  • Drilling Stem Tools From China Manufacturer
  • Drilling Stem Tools From China Manufacturer
  • Drilling Stem Tools From China Manufacturer
  • Drilling Stem Tools From China Manufacturer
  • Drilling Stem Tools From China Manufacturer

Drilling Stem Tools From China Manufacturer

After-sales Service: 18mths
Warranty: 18mths
Manufacturing Process: Casting
Surface Treatment: Polishing
Operation Pressure: Atmospheric Pressure
Material: Cast Steel
Customization:
Gold Member Since 2016

Suppliers with verified business licenses

Jiangsu, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (14)

Basic Info.

Standard
API
Supply
100sets/Mth
Pkg
Wooden Box
Lead Time
50days
Transport Package
Wooden /Steel Carton
Specification
customized
Trademark
techcore
Origin
China
HS Code
8431431000
Production Capacity
5000 Set/Year

Product Description

Well Testing    Downhole Drill Stem Testing(DST) Tools

A properly conducted well test is a temporary completion of a well to acquire dynamic rate through time, pressure, and fluid property data. The well test often indicates how the well will perform when it is subjected to various flow conditions. An analysis is usually performed on the data to determine reservoir parameters and
characteristics. Production decline may be predicted using these parameters and characteristics. The production decline can be used to predict cash flow. Once cash flow is known, improved drilling, completion, and production decisions can be made on this well and other wells in the field. Well test objectives can be classified as short term or long term.
• Short-term well test objectives typically involve gathering and analyzing sufficient well data to obtain a description of the reservoir system in the vicinity of the wellbore.
• Long-term well test objectives focus on gathering and analyzing data to obtain a complete description of the reservoir. The test time required to satisfy the test objectives varies for each reservoir. These test times are directly related to the testing costs and data needed.
The well testing and sampling operation is typically accomplished with an assortment of test tools. The basic downhole test tools required for a well test include:
• Reversing valve
• Tester valve
• Samplers
• Gauges (pressure and temperature recorders)
• Packer
• Tubing conveyed perforating guns  

BOP Safety Valve-Super Safety Valver
The Super Safety Valve is a Fail Safe Safety Valve for testing from a land or jack-up rig. It is normally run inside or below the Blow OutPreventer (BOP) and is used to control well flow.
*Controlled by two hydraulic lines and contains a chemical injection port
* Located below the vertical shock absorber
*Close by spring force but has a nitrogen charge chamber to quicken the closing time
*Held open by maintaining hydraulic control pressure on the control line
Drilling Stem Tools From China Manufacturer

 
Specification
 
OD/In Working pressure/Mpa Service Environment Working temperautre connection
 8" 105 Mud, Crude oil, Natural gas with H2S and acid -29ºC- +204ºC ACME
Drilling Stem Tools From China ManufacturerDrilling Stem Tools From China ManufacturerDrilling Stem Tools From China ManufacturerDrilling Stem Tools From China Manufacturer

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now